SERVICIOS

CMT: (Cut, Make, Trim): 

This type of garment manufacturing is perfect for when you know exactly how your clothes should look like. Meaning that you have figured out the design, sizes, grading, patterns, fabrics, dyeing, and printing. The only thing a clothing manufacturer does is – cut, make, and trim.
Ideally, a clothing factory providing this service should have automatic fabric cutters, experienced sewing and quality-control technicians. Learn more about one of these aspects on the fabric cutting page.

  • Full design specs including seam-to-seam measurements.
  • Fabrics selection and grading
  • Fabrics pattern(s)
  • Stitching methods
  • Haberdashery selection
  • Printing methods (if needed)
  • Embroidery methods (if needed)
  • Packing methods
  • ETD materials
  • Sample making: 5 days
  • Production: 20 – 30 days

CMPT (Cutting, Making, Packing, Thread):

Is also a type of garment manufacture when you only need those final steps of making a garment.

Full design specs including seam-to-seam measurements

Fabrics selection and grading

Fabrics pattern(s)

Stitching methods

  • Haberdashery selection
  • Printing methods (if needed)
  • Embroidery methods (if needed)
  • Packing methods
  • ETD materials
  • ETD garment

 1 month

ODM (Original Design Manufacturer)

For those seeking creative and ready-to-go solutions, our ODM service offers a range of pre-designed clothing and textile products. Clients can choose from our selection of designs and customize them according to their preferences, saving time and effort while still having unique and high-quality products.

PROCESS

LEAD TIME

Period 1

Step 1: Propose designs in 2D, 3D and materials lists.

1 month

Step 2: After approved step 1, make samples in similar material.

7 days

Period 2

Step 1: Procurement and development of materials at small quantity

7 days

Step 2: Make Pre-production samples.

15 days

Period 3

Step 1: Procurement and development of materials at bulk quantity

10 days

Period 3

Step 2: Production – CMPT. (send in-production sample)

20 days

Period 3

Step 3: Delivery.

20 days

With an in-house Quality Assurance (QA) and Quality Control (QC) team adhering to AQL 2.5 or 4.0 standards, we prioritize precision at every stage of the manufacturing process. We also welcome third-party QA assessments and customer site visits as part of our commitment to transparency and accountability.

OEM (Original Equipment Manufacturer)

Our OEM service allows brands and businesses to leverage our manufacturing capabilities and expertise to produce clothing and textile goods under their own brand label. We collaborate closely with our clients, starting from product design to the final production, ensuring that the end result aligns perfectly with their vision and brand identity.

PROCESS

LEAD TIME

Step 1: Review Your Final Tech Pack. We would like to get your Techpack with a measurement chart for offering FOB quotation. In case you don’t have techpack, please send us original sample for reference

1 – 2 days

Step 2: Making Your Physical Proto Sample, Fit Sample.

4 days for reference fabric 15 days for correct fabric.

Step 3: Submit Your Bulk Production Order Once the price and sample are approved and the PO is released, the invoice will be issued for 50% advantage, and the PPS will be submitted while materials are prepared for bulk production

10 – 12 days

Step 4: Receive Bulk Production. We can deliver (almost) anywhere in the world. We’ll issue an invoice for the balance of your order upon delivery, and a freight invoice after rates actualize.

60 – 90 days after signing PO and receiving payment

Póngase en contacto con nosotros

If you have any questions, please feel free to contact us at any time to solve them for you

=

Póngase en contacto con nosotros


Formulario de contacto

Esto se cerrará en 0 segundos